NYC moving guide · Building access
How to Reserve a Freight Elevator for Moving in NYC
Two buildings. Separate delivery visits. One clear plan for the elevator time, paperwork and access your move needs.
Get the planning worksheet
Quick answer
What should you confirm before reserving a freight elevator?
Contact management at both addresses as soon as you know your proposed move dates. Ask for each building’s written move and delivery rules, available elevator windows, entrance instructions and required vendor documents. Get the reservation and document acceptance confirmed in writing. Check empty-bin delivery and pickup separately; the main move’s approval may not cover those visits.
Start with both buildings
Reserve the elevator at both addresses: a seven-step plan
Your current building and your new building may have different hours, entrances and approval processes. Treat each reservation as its own task, then fit them together with your moving provider. For the rest of your schedule, use the NYC moving checklist.
Request the building’s move and delivery requirements
Ask each property manager or authorized building contact for the current policy and reservation form. Confirm notice deadlines, permitted days, elevator availability, fees or deposits, and cancellation terms. Ask which rules apply to the main move, empty-bin delivery and empty-bin collection.
Confirm the entrance, elevator and on-site contact
Record the exact entrance and check-in procedure. Ask which elevator you may use, whether an operator is required, and who supplies and installs any padding or floor protection. Note stairs, tight turns and other access constraints before your providers agree to the visit.
Coordinate the two elevator windows
Share both buildings’ available times with your mover. Allow for loading, travel, unloading and the approved close-out process. Ask providers whether they can accommodate the proposed schedule before committing; an elevator booking does not guarantee a vendor’s arrival time.
Send the required vendor paperwork for review
Obtain the building’s exact document instructions and recipient details. Send those requirements to each relevant provider and ask what they can supply. If a certificate of insurance (COI) is requested, have the provider and its insurance contact address the building’s wording. Do not assume one vendor’s documents cover another vendor’s visit.
Get the window and document acceptance in writing
Ask management to confirm the address, visit date, start and finish time, approved entrance, elevator arrangement and on-site contact. Confirm that required documents have been accepted, rather than merely received. Share the final instructions with the people carrying out the visit.
Prepare the route and protection
Check the agreed route with building staff and your provider. Confirm who will install and remove protection, where items may wait and how exits will stay clear. Use equipment appropriate to the route and follow its operating and load instructions.
Reconfirm access and close out the visit
Before the visit, check that the reservation and contacts are still current. On arrival, follow the building’s check-in instructions. If timing changes, contact management and the provider promptly. Clear the route and complete any required inspection or sign-off before handing the elevator back.
Planning a workplace move? Add department owners and IT coordination with the NYC office moving checklist.
Four roles to coordinate
COI and vendor paperwork: who supplies what?
Use this responsibility map to decide whom to contact. The building’s written requirements and each provider’s confirmed arrangements control the actual process.
You / move coordinator
Request both policies, coordinate dates, send requirements to providers and keep the written approvals together.
Building management
Specifies access rules and required documents, reviews submissions and confirms the authorized elevator arrangement.
Moving provider
Confirms the move schedule, equipment and protection arrangements, and supplies its own requested vendor documents.
Crate vendor
Confirms its delivery and pickup arrangements and what documentation it can provide for those specific visits.
For EazyCrate visits, contact the team with your building’s requirements and confirm the available arrangements before booking a building slot. Do not treat a COI submission as building approval or as a promise of coverage for the entire move.
Confirm crate delivery and pickup separately
A short crate visit can still need building permission. Record where each visit will happen and ask whether it needs a separate reservation or paperwork. Review how delivery and pickup work, then confirm your specific access needs with the team.
Before the move
Empty-bin delivery: confirm the delivery address, accepted access window, entrance and person receiving the bins.
On moving day
Main move: coordinate the outgoing and incoming elevator windows with the provider handling your belongings.
After unpacking
Empty-bin pickup: confirm the collection address, access window and building permission for the return visit.
Walk the route first
Measure and plan the loading route
Check the full path, not just the elevator doorway. Share private route measurements and restrictions with your provider so it can assess suitable equipment. Consult bin suitability and packing guidance and the moving dolly guide; avoid guessing how many loads will fit.
- Check doors, turns, floor transitions and elevator clearances with the provider before selecting the setup.
- Inspect equipment before use and follow the manufacturer’s load and operating instructions. Do not use damaged equipment.
- Keep the load stable and your view clear; keep exits and common routes unobstructed. Do not hold elevator doors open with equipment.
- Confirm any padding or floor protection with building staff. Stop and seek assistance if the route or equipment is unsuitable.
The CCOHS guidance on mechanical aids for moving materials supports choosing suitable equipment and checking its condition. Actual equipment instructions and building restrictions still apply.
Consistently packed, clearly labeled bins can make organizing loads easier. The number of elevator trips still depends on your inventory, safe loading limits, equipment and the building layout; no time saving is guaranteed.
What to do if access is delayed or the window changes
Contact the building’s authorized person and the affected provider as soon as the problem is clear. Explain which address and visit are affected, the current timing and what you need confirmed.
- Ask for a revised arrangement. Confirm whether the building can authorize another window, a different approved route or a rescheduled visit.
- Get the new details in writing. Record the contact, date, start and finish time, and any changed requirements.
- Check provider availability and terms. Do not assume a building extension means the mover or crate team can stay, or that a change is free.
- Keep the route safe while waiting. Use only an approved holding area and keep entrances, exits and elevator access clear.
For an EazyCrate delivery or pickup change, contact EazyCrate and review your booking terms before relying on a revised plan.
Keep the details together
Your two-address reservation worksheet
Use one sheet for both buildings, with separate delivery and pickup notes. It is a blank planning tool: completing it does not reserve an elevator or confirm building approval.
Download the one-page worksheetPDF · 1 page · Print and complete privately
01 · Current address
- Address, unit and floor
- Building contact and phone or email
- Main move date and approved start / finish
- Entrance, elevator and operator arrangement
- Paperwork deadline and approval contact
- Written approval reference and date
- Fees, deposits and protection requirements
02 · New address
- Address, unit and floor
- Building contact and phone or email
- Main move date and approved start / finish
- Entrance, elevator and operator arrangement
- Paperwork deadline and approval contact
- Written approval reference and date
- Fees, deposits and protection requirements
Add the crate visits
For empty-bin delivery and empty-bin pickup, record the address, date, accepted access window, contact and written confirmation reference. Ask whether each visit needs its own reservation, documents or staff access.
Before the visit, check three things
- Both building approvals are received and shared with the relevant providers.
- The entrance, protection arrangements and safe route are confirmed.
- You have the delay contact and the process for requesting a revised window.
Keep completed forms private. Share insurance paperwork only with authorized recipients.
Freight elevator reservation FAQs
How early should I reserve a freight elevator for an NYC move?
Ask both buildings as soon as you know your proposed move dates. Each building sets its own notice requirements, availability and approval process. Request the current written policy and coordinate available windows with your providers; there is no single booking deadline you should assume for every building.
Do I need a COI for empty moving-bin delivery and pickup?
Ask management at each delivery or pickup address. A building may require vendor paperwork or a separate access approval even for a short visit. Send its exact requirements to the crate vendor and confirm what it can provide. Submitted paperwork does not mean the building has approved access.
Can I use a passenger elevator if my building has no freight elevator?
Only use an elevator and route that building management authorizes for the visit. Ask about permitted times, protection, equipment, load restrictions and any operator requirement. The absence of a freight elevator does not automatically mean a passenger elevator is available for moving.
What should I do if my move exceeds the reserved elevator window?
Contact the building’s authorized person and your provider before the window ends, or as soon as a delay becomes apparent. Ask for a revised arrangement and get it confirmed in writing. Check provider availability and applicable terms; an extension, a replacement slot or free rescheduling should not be assumed.
Plan access before the visit
Bring your building requirements to EazyCrate
Share the proposed dates, elevator windows and access instructions for your delivery and pickup addresses. Ask the team to confirm what arrangements and vendor paperwork are available for your visits.
Confirm your access needsStill planning? See how crate rental works.
Sources and scope
This guide supports planning; your building’s current written policy determines its reservation and access requirements. Building procedures, street rules and provider availability can change.
- 386 Park Avenue South: moving procedures — an example of one commercial building’s policy.
- NYC DOT: truck driver FAQ — street loading and parking information.
- CCOHS: mechanical aids for transporting materials — general equipment-selection and inspection guidance.
